

You can plan complex activities such as installing a new system or updating existing systems. The Maintenance Planner is an SAP solution that helps you plan and maintain systems in your landscape. If errors are encountered during the process, the conversion is stopped. The pre-check result provides the log that needs to be addressed before the actual conversion process. To ensure accuracy, the checks are run twice in the SUM during the conversion process. These checks provide users with all the mandatory steps for SAP S/4 HANA Finance migration in the form of SAP Notes.
#Meaning of sap ecc install
These files the Software Update Manager (SUM) uses to install SAP S/4 HANA Finance.
#Meaning of sap ecc drivers
It then, creates the download files like add-ons, package, database drivers stack files etc. You must use the Maintenance Planner for your conversion to SAP S/4 HANA Finance. which are required to be activated.ĭo Read: SAP New GL Migration – Overview How Maintenance Planner is used for SAP HANA Migration? Others are Cash Management, Bank Communication Management, etc.
#Meaning of sap ecc full
Since in HANA we need to work on various new functions, thus, these should be in active mode to get their full functionality.įor example, you need to activate the New GL in order to work on New Asset Accounting. In case, it not yet activated, ask your technical counterpart to activate it. In order to perform the conversion, you should activate all the business functions in the system. The Maintenance planner checks the system with regards to the business functions, industry solutions, add-ons, etc. Thus, in short, the phase where we need to do the brownfield migration, we call it the Customization Phase.Īfter these customizations, we will perform:. Still here in the new system, we need extension ledger, simulation ledger, add global currency types here. Here we need to do all those new customizations which are missing from the previous old system database.įor example, In the old system, we already had a new GL configuration, leading and non-leading ledgers configuration. The Pre-Conversion phase is also called Customization Phase. Why we need Pre-conversion phase?īecause, in this phase, we need to perform all the new configurations. This consequently makes the actual conversion process error-free. The purpose of the Pre-conversion stage is to check the issues or problems in the SAP ECC system and fix them in advance. This stage is also called a Preparatory stage. This helps us to find any issue in the early phase of the project. In the Pre-conversion stage, we perform all pre-steps which we need to start conversion. There are three phases of the conversion process from ECC to HANA. For instance, SAP HANA license, original cloud infrastructure as well as SAP managed services. However, this also depends on budget allocation, resources, time and needs of the business.Ĭustomers can use SAP’s cloud offering called SAP HANA Enterprise Cloud.

Therefore, both platforms has their own qualities. Else, we can use the cloud to increase flexibility with new user experience to business users.

Well, this needs to be ascertained at the beginning of the process that, where the SAP HANA is to be migrated.Įither we can easily deploy HANA on-premise to gain maximum control with low risk. Watch Slide: What’s New is SAP S/4HANA Finance 2020? Which Platform should we use for Migration? Hence, the need for S/4HANA came into the picture.įYI- Latest version that now has launched is S/4HANA 2020. This includes performance issue, being slow and outdated reports and many more. While the previous versions like SAP R/3 and SAP ERP were outsourcing databases, which lead to many drawbacks. It is based on cloud technology that uses an in-memory database. What is the new SAP S/4HANA?Īn updated version, a successor or call it a new functionality of SAP ERP. I hope you understand the concept behind doing SAP HANA Migration. This way, not only we curtail the limitations of old databases, but also, get the complete data in sync and connected. Hence, to get all data under the new platform, we do the data migration in SAP HANA. Since much data is there in the old database, we need to shift it all to the new S/4HANA. The new S/4HANA uses the in-memory database, while the previous ones were outsourcing database. Why we need to do this SAP S4 HANA Data Migration?
